ACASFA 2012
ACA Standard Form of Agreement for the Appointment of an Architect. ACA SFA 2012
“This update of the popular contract between client and architect meets the need for a fair and balanced Standard Form of Agreement following the demise of SFA/99″ Brian Waters – ACA Immediate Past President
This contract closely follows it’s predecessor SFA/99, which has served both architects and clients well since its inception as SFA/92. It has been updated to include the HGCRA and Bribery Act amendments and is suitable for the full range of comercial and consumer projects and includes model letters for each kind of project to assist architects and their clients to come to a fair agreement on contract terms.
ACA SFA/2012:
- maintains the same balance of rights and responsibilities between architect and client as the previous editions, SFA/99 and ID/05.
- all terms are fully insured by standard professional indemnity insurance policies.
- contains a ‘no set-off’ clause as in SFA/92, SFA/99 and ID/05. (This term is vital for enforcing payment against unreasonable clients.)
- provides for an 8% over base rate charge for unpaid accounts, as set out in legislation (the Late Payment of Commercial Debts Order 2002), just as in SFA/99.
- allows an architect to resign a commission. (This has always been a valuable clause for architects, particularly when an awkward client may make it impractical for the architect to continue, possibly because of a moral issue when it may not be easy to identify a specific breach of contract.)
- includes no provision for a client to require the removal of a member of the architect’s staff (which could include a partner or a director) from a project.
- includes an optional, tear-out form of Collateral Warranty and removeable notes with model letters
- special terms are provided for, as is the opportunity for attachments to provide for additional documents (e.g.brief, survey, etc) to form part of the contract.
- incorporates the RIBA Plan of Work 2007.
- is not gender specific.
- the ACA Form has been amended to cover the new Construction Act and Bribery Act requirements.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.

























